This is a list of current active keelboat projects. If you're working on a project that isn't on this list, please add it and let people know how they can get in touch with you to help.
[edit]
Capri 25 "Pomodoro"
Currently left to do 9/18/06:
- Replace the netting on the lifelines and extend it aft-- we need 8 more of those little padeyes.
- Paint the bulkheads where they've been sanded (penetrating epoxy is easiest but stinkiest)
- Install fender washers and nuts on the bow cleats.
- Rig the traveller in a more agreeable fashion.
- Weld the crack in the stern pulpit.
- Replace jam cleats with clutches for main and jib halyards.
- Remove cam cleats forward of primary winches (they cause overrides).
- Install cotter pin in stanchion on starboard side forward of cockpit to prevent it from being pulled out.
- Install latches for lazarettes.
- Get the green spinnaker halyard down from the top of the mast.
- Move block and padeye for jiffy reef line farther aft to aid in flattening the sail when reefed.
- Add floatation- there is almost 20 cubic feet of strofoam currently stored in the Ommpa-Loompa container that needs to be cut and installed. Good locations are under the sole of the cockpit, aft ends of the storage areas under cockpit seats, and forward under the V berth.
[edit]
Ensigns
[edit]
Commanders
- Daisy has a leak in her deck, apparently coming from a screw hole. The leak is marked in pencil. The screw should be re-sealed.